Welding Journal
Jump to:
Ensuring Overmatching Strength in Pipeline Girth Welds
Guidance is given to prevent girth weld failures in newly constructed pipelines
March 2024
In a previous Welding Journal article (Ref. 1), several girth weld failures in newly constructed cross-country pipelines were described. These failures occurred in pipelines constructed using conventional stove-pipe welding methods (i.e., cellulosic-coated AWS EXX10-type electrodes) at relatively low global strain levels either during preservice hydrostatic pressure testing or in service soon after the pipelines were commissioned. Some of these failures were attributed to undermatching weld strength and/or h..
Join AWS to read the full article
Get access to key insights and premium industry news today!
Already a member? Log In
Already a member? Log In
Publication Archive
View past issues of our magazines, including Welding Research Supplements in PDF format.